Hayward Blower and Control Board Kit for IDL2 Heaters (Jakel Replacement) | IDXL2BWR1931
- In stock, ready to ship
- Backordered: contact us for ETA
- SKU:
- IDXL2BWR1931
-
Poolaroo Promise
- Fast Shipping — Ships in 1–2 Business Days
- 30-Day Risk-Free Returns — We Pay Return Shipping, No Restocking Fees
- Powered By People Who Care - No Faceless Conglomerate
About This Item
The Hayward Blower and Control Board Kit (IDXL2BWR1931) is the OEM replacement blower and control board assembly for Hayward heaters equipped with the IDL2 induced-draft blower system, serving as the direct Jakel-brand blower replacement.
IMPORTANT: PROFESSIONAL SERVICE REQUIRED
Gas and electrical heater components must be serviced by a licensed pool professional or qualified HVAC technician. Do not attempt to service gas or high-voltage components without proper certification.
This kit provides the blower motor and control board as an integrated assembly for Hayward IDL2 heater configurations. The blower draws combustion air through the heat exchanger in the induced-draft sequence, while the control board manages blower operation and ignition timing. Replacing these components as a matched kit ensures correct electrical and mechanical compatibility between the blower motor and its governing control circuitry.
Specifications
| Hayward Part Number | IDXL2BWR1931 |
| UPC | 610377050487 |
| Also Known As / Line | IDL2 Blower/Control Board Kit — Jakel Replacement |
| Channel | Open Line |
Poolaroo Pro Tip
Before ordering, confirm that your heater uses the IDL2 induced-draft blower configuration. The IDL2 designation is typically found on the heater's rating plate or in the unit's service manual. Because the blower and control board are supplied as a matched assembly in this kit, replacing both components together eliminates the risk of mismatched electrical characteristics that can occur when sourcing the blower and board independently. Have a licensed pool professional or HVAC technician perform the replacement and verify blower-speed and ignition-sequence operation before returning the heater to service.
